9/30: Produced a first draft of the preliminary report for individual review throughout the week. Ashton was delegated as giving the preliminary report presentation on 10/9 in Whitaker 100.
10/5: A final evaluation of the report against the provided rubric for the preliminary report was conducted via google chat and the assignment was printed as directed.
Turn in:
This week was largely spent preparing our preliminary report for submission. The group appointed Ashton to deliver the presentation on 10/9 in Whitaker 100 in the third time slot. In finalizing the report, a few specifications were added/sharpened including a 1 mA threshold for driving current in the sock prototype for ion delivery.
The group aims to meet with client Dr. Moran for next week (10/9-10/14) before FallBreak to provide a copy of the Prelim Report and pursue next tasks visualized in the Gantt Chart.
10/5: A final evaluation of the report against the provided rubric for the preliminary report was conducted via google chat and the assignment was printed as directed.
Turn in:
This week was largely spent preparing our preliminary report for submission. The group appointed Ashton to deliver the presentation on 10/9 in Whitaker 100 in the third time slot. In finalizing the report, a few specifications were added/sharpened including a 1 mA threshold for driving current in the sock prototype for ion delivery.